Buyer guides
Total landed cost of a US-built robot cell in Europe: what to include
By Robot Export team · Published · 2 min read
Why the quote is not the cost
Quotes from American integrators are rarely comparable as received. Some include installation in Europe, some quote ex-works, and few include European compliance work. Total landed cost puts every proposal on the same basis, so you can compare US suppliers with European and Asian alternatives fairly.
The cost lines
- Equipment price: robot, tooling, fixtures, controls and safety
- Engineering and programming, including any redesign for European electrical practice
- Factory acceptance test in the US, including your travel to attend
- Export packing and crating (ISPM 15-compliant wood for crates and pallets)
- Inland transport to Houston, Savannah or New York/New Jersey and US export filing
- Ocean freight to your European port and cargo insurance
- Destination port charges and customs brokerage
- EU customs duty and import VAT
- Inland transport to your plant, rigging and placement
- Installation, commissioning and site acceptance
- CE conformity work, documentation and translation
- Spare parts and wear items for the first year
- Currency conversion and bank charges
Export steps on the US side
US exports above certain values, or that need a licence, require Electronic Export Information filed under the Foreign Trade Regulations. Some automation equipment and controllers can also fall under the Export Administration Regulations. These are usually the seller's tasks under most Incoterms rules, but confirm who files and who pays.
EU duty and VAT
The EU third-country duty on industrial robots (TARIC 8479 50 00 00) is 1.7%, and import VAT is due in the member state of import. Check the TARIC consultation on your import date, because trade measures between the EU and the US have changed often.
Hidden costs to watch
A cell designed for the US often needs changes before it can carry CE marking: wiring practice, disconnects, safety components and documentation. Price that work up front, along with utilities, foundations, downtime during installation and local service cover.
How to use the framework
Send the same cost template to every shortlisted supplier, ask them to fill in what they provide and mark exclusions, then price the exclusions yourself. To compare American suppliers with other sourcing countries on the same basis, start from the Robot Export hub at https://robot-export-global.lovable.app.
Share your brief
If you are comparing suppliers or need a landed-cost template for a specific project, share a sourcing brief through the contact form below. We only reply with information we can stand behind.
Sources
- eCFR — 15 CFR Part 30, Foreign Trade Regulations (Electronic Export Information)
- U.S. Bureau of Industry and Security — Export Administration Regulations
- European Commission — TARIC consultation, 8479 50 00 00
- European Commission — Customs procedures and import VAT in the EU
- European Commission — Machinery: Directive 2006/42/EC and Regulation (EU) 2023/1230
- IPPC — ISPM 15, Regulation of wood packaging material in international trade
- International Chamber of Commerce — Incoterms® 2020
Ready to start? Share your brief
Every sourcing project starts with a short brief: your application, volumes, destination and timeline. Send it and we'll come back with next steps.
Share your brief